ANTIKOR — national anti-corruption portal
Kyiv: 15°C
Kharkiv: 12°C
Dnipro: 14°C
Odesa: 17°C
Chernihiv: 15°C
Sumy: 12°C
Lviv: 16°C
Uzhhorod: 16°C
Lutsk: 17°C
Rivne: 16°C

Energoatom connected a thousand-ton power unit to the Ukrainian energy grid after scheduled repairs

Читати українськоюЧитать на русском
Energoatom connected a thousand-ton power unit to the Ukrainian energy grid after scheduled repairs
Energoatom connected a thousand-ton power unit to the Ukrainian energy grid after scheduled repairs

To fulfill the task of the Ministry of Energy of Ukraine, Energoatom connected the next power unit to the power grid ahead of schedule - after reloading nuclear fuel and scheduled equipment repairs.

Energoatom reports this.

Thanks to the prompt actions of Ukrainian nuclear workers, the return of the power unit after repair will significantly strengthen the domestic energy grid.

Considering the difficult situation in the energy sector, the company’s specialists are making every effort to promptly carry out scheduled preventive maintenance while ensuring the required quality of work.

All other power units of the company located in Ukrainian-controlled territory are operating as planned.


Topics: OutagePowerEnergoatomMinistry of Energy

Date and time 17 July 2024 г., 13:41     Views Views: 1848
Comments Comments: 0


Comments:

comments powered by Disqus

’‚Ћђ€ §‘’Ћђ§ћ з Ђ‡Ћ‚ЋЊ

loading...
Загрузка...

Our polls

When do you think the end of the war in Ukraine is possible?








Show Poll results
Show all polls on the website
0.062202